860-387-7880
860-387-7880
Effective site control in Los Angeles starts long before concrete is poured or framing begins. With long dry seasons followed by sudden rain events, unmanaged runoff can quickly turn a clean jobsite into a compliance issue. Straw wattles are a proven erosion and sediment control solution used across residential, commercial, and infrastructure projects throughout the Greater Los Angeles area.
Supply Ontime’s rice straw wattle is designed to slow, spread, and filter surface water before it carries soil, debris, and sediment off site. This is especially important in hillside neighborhoods, street-adjacent lots, and developments near storm drains where runoff can move fast and cause downstream issues.
A straw wattle functions as a physical barrier that interrupts water flow, reducing velocity and allowing sediment to settle. Keeping soil in place helps protect sidewalks, streets, and drainage systems while supporting environmental compliance on active construction sites. In Los Angeles, where even moderate rain can overwhelm dry soil, this type of preventative control plays a critical role in site management.
Applications and Recommended Use
|
Form Type |
Common Applications and Performance Notes |
|
Rice Straw Wattle (8–9 in. thick, 25 ft roll) |
Used for erosion control, sediment control, and storm-water runoff control. Helps stabilize slopes by slowing, spreading, and filtering overland water flow. |
|
Storm Drain Protection Layout |
Can be snaked around storm drains to protect against sediment pollution and keep debris out of drainage systems. |
|
Sidewalk and Street-Edge Runs |
Installed along sidewalks on the bare-lot side to reduce sediment washing toward curbs and gutters. |
|
Jobsite Sediment Control |
Helps prevent sediment from washing into gutters during unexpected rain events or periods of heavy runoff. |
Supply Ontime’s rice straw wattles are supplied in 25-foot rolls and measure approximately 8–9 inches in thickness. They are sold individually, making it easy to stage erosion control as a project progresses rather than over-ordering upfront.
Each wattle is designed to remain effective for approximately 3–5 years, depending on exposure and site conditions. This lifespan allows them to be used through multiple phases of construction without constant replacement, which is valuable on longer projects or phased developments common throughout Los Angeles.
Proper installation plays a critical role in how effectively straw wattles perform on a jobsite. While the product itself is simple, placement strategy determines whether runoff is slowed and filtered or allowed to bypass the barrier entirely. In Los Angeles, where rain events can arrive suddenly after long dry periods, wattles must be installed proactively and with attention to natural drainage patterns. Taking time to plan placement before storms hit helps protect surrounding streets, sidewalks, and storm drains while maintaining site stability throughout construction.
Evaluate drainage patterns: Identify where water naturally flows during rain events and where sediment is most likely to migrate.
Install along contours: Position wattles perpendicular to flow paths to slow sheet flow and capture sediment.
Protect drains early: Install around storm drains before rain occurs to prevent sediment from entering the system.
Secure along edges: Use wattles along sidewalks and curbs where soil meets hardscape.
Inspect and adjust: After rain events, check placement and re-align if sediment begins to bypass the barrier.
When installed correctly, straw wattles create a consistent line of defense against erosion and sediment movement. Regular inspection and adjustment ensure they continue performing as site conditions change. This proactive approach helps Los Angeles projects stay compliant, reduce cleanup costs, and maintain safer, cleaner jobsites from early grading through final construction.
Straw wattles are designed to perform in real-world site conditions, not controlled environments. In Los Angeles, that means dry soil, sudden rain, uneven terrain, and ongoing construction activity. Performance is measured by how well the wattle holds soil in place over time, prevents sediment migration, and continues functioning as site conditions evolve. When properly installed, straw wattles act as a stable, passive system that manages runoff without requiring constant intervention.
Because they slow and spread surface water rather than blocking it outright, straw wattles reduce erosion without creating pressure points that can fail during heavier rain. This makes them especially effective on slopes, along street edges, and near drainage paths where runoff velocity is the main concern. Their ability to remain effective through multiple rain events supports consistent site control from early grading through later construction phases.
Over the long term, straw wattles provide a dependable erosion-control solution that helps projects stay compliant, reduce cleanup costs, and protect surrounding infrastructure. Their durability through changing conditions makes them a practical choice for Los Angeles jobsites that demand reliable sediment control without overcomplicating site logistics.
Supply Ontime provides reliable delivery across the Greater Los Angeles area. Customers can count on:
Same‑Day or Scheduled Delivery
Supply Ontime provides same-day delivery service for urgent framing needs and allows customers to schedule deliveries in advance for bigger projects. The system delivers materials at the exact time construction workers need them which prevents delays and maintains project timelines.
Flexible Unloading Options
Deliveries can be handled in multiple ways depending on the site. Truck Bed delivery works for lighter items; Curbside delivery keeps drop‑offs simple within 5 feet of the truck; and White Gloves service places materials at the doorway for added convenience.
Clear Delivery Rates
Pricing is weight‑based and transparent, so there are no surprises. Customers know up front what it will cost to have materials delivered, whether it’s a small order under 20 lbs or a large shipment requiring specialized handling.
Convenience at Drop‑Off
The delivery process needs to remain simple for all delivery options that customers select. The materials can be unloaded from the truck either by placing them at the curb or by staging them at the first entrance of the building. The system provides flexibility, which enables construction teams and homebuilders to concentrate on building activities while avoiding logistical concerns.
For Los Angeles construction projects where runoff and sediment control are non-negotiable, straw wattles provide a simple, effective, and field-ready solution. Supply Ontime’s rice straw wattle supports cleaner sites, better drainage control, and smoother project execution from start to finish.